Clean Green Energy Partners With Burtek Enterprises for Wind Turbine Manufacturing

BRIGHTON, MI -- (Marketwired) -- Jan 14, 2014 -- Burtek Enterprises Inc. of Chesterfield, Michigan has been selected as the strategic manufacturing and assembly partner of Clean Green Energy's (CGE) WIND--e20® on-site wind turbine.

The companies have an MOU signed. Burtek will be responsible for the fabrication and assembly of the WIND--e20®, managing the value stream, and to work with CGE to check and improve CGE's design for cost-effective manufacturability.

Burtek is a world leading and industry recognized full-service design, engineering, and manufacturing organization. This 5-star military contractor has 25-years of design, production, testing and integration of complex systems and applications for mobile military ground vehicles, radar platforms and other systems for the Department of Defense.

As a "Ship When Ready Supplier" of Northrop Grumman, Burtek prides themselves in delivery. "Burtek has taken a radar system from concept design to final combat zone delivery in a six month timeframe," says Bryan Zaplitny, President of CGE. "That solidified them as the perfect manufacturing partner for WIND--e20®."

Specializations such as large structure welding, hydraulic leveling systems, and quick-transport radar stations make them the ideal manufacturer for the WIND--e20®. With a lean, value increasing manufacturing culture, they are continuously working from our perspective to increase affordability.

Burtek's 230,000 square foot flexible manufacturing environment is ready to be optimized for efficient and timely delivery of WINDe--20®. "As a partner of CGE on the WIND--e20® program, we are going to have to be responsive," says Burtek President Jeff Daniel. "We are going into production in 2014."

Interested parties are encouraged to watch this video about this strategic partnership: http://www.youtube.com/watch?v=LI9eMdie-Uk

Mr. Daniel met with CGE along with the McKenzie Bay International board to begin discussions in May 2013. The Companies had a combined retreat at the Rockwell Lake Lodge in Luther, Michigan.

About the companies:

Clean Green Energy (CGE) has been an innovator in the alternative energy industry since 1989. CGE has a letter of intent to merge with McKenzie Bay International (PINKSHEETS: MKBY). http://www.cleangreenenergyllc.com, www.mckenziebay.com

Burtek Enterprises Inc., headquartered in Chesterfield, Michigan, is a leading American metal fabricator and systems integrator serving the Defense, Aerospace, Industrial and Energy markets. http://www.burtekenterprises.com

Certain statements made in this release constitute forward-looking statements and do not guarantee future performance. Actual results or developments may differ materially from the projections in the forward-looking statements.

Add to Digg Bookmark with del.icio.us Add to Newsvine

Contact: 
Rich Kaiser
YES INTERNATIONAL
757-306-6090 


Featured Video
Editorial
Jobs
Principal Engineer for Autodesk at San Francisco, California
Machine Learning Engineer 3D Geometry/ Multi-Modal for Autodesk at San Francisco, California
Senior Principal Software Engineer for Autodesk at San Francisco, California
Upcoming Events
Consumer Electronics Show 2025 - CES 2025 at Las Vegas NV - Jan 7 - 10, 2025
Collaborate North America 2025 at Novi MI - Jan 28, 2025
Celebrate Manufacturing Excellence at Anaheim Convention Center Anaheim CA - Feb 4 - 6, 2025
3DEXPERIENCE World 2025 at George R. Brown Convention Center Houston TX - Feb 23 - 26, 2025



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise