Mazor Robotics Receives Several Recent Purchase Orders for Renaissance Systems

CAESAREA, Israel — (BUSINESS WIRE) — July 7, 2015 — Mazor Robotics Ltd. (TASE:MZOR; NASDAQGM:MZOR), a developer of innovative guidance systems and complementary products, announced today that it received purchase orders for and delivered seven Renaissance systems and one system upgrade in the second quarter ended June 30, 2015. Six of the systems were delivered to U.S. hospitals and one was delivered to Spain. The Company ended the quarter with 93 Renaissance systems installed globally, with 53 in the U.S., the Company’s primary growth market, compared with 72 and 39 systems for the second ended June 30, 2014, respectively.

“Our results in the second quarter demonstrate solid execution by our global sales and marketing team,” said Ori Hadomi, Chief Executive Officer. “The quarter reflects the successful implementation of several key initiatives, such as engaging with the hospital c-suite earlier in the sales cycle to have a better understanding of their process and level of commitment as well as expanding into new metropolitan markets. These continuing efforts together with the market’s increasing awareness and interest in Renaissance give us momentum as we enter the second half of 2015.”

The Company currently intends to report its complete financial results for the second quarter ended June 30, 2015 on July 28, 2015.

About Mazor

Mazor Robotics (TASE: MZOR; NASDAQGM: MZOR) believes in healing through innovation by developing and introducing revolutionary robotic-based technology and products aimed at redefining the gold standard of quality care. Mazor Robotics Renaissance® Guidance System enables surgeons to conduct spine and brain procedures in a more accurate and secure manner. For more information, please visit www.MazorRobotics.com.

Forward-Looking Statements

This press release contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 and other securities laws. Any statements in this release about future expectations, plans or prospects for the Company, including without limitation, statements regarding the Company’s momentum as we enter the second half of 2015, or regarding the intended release date of the financial results for the quarter ended June 30, 2015, e, and other statements containing the words “believes,” “anticipates,” “plans,” “expects,” “will” and similar expressions are forward-looking statements. These statements are only predictions based on Mazor's current expectations and projections about future events. There are important factors that could cause Mazor's actual results, level of activity, performance or achievements to differ materially from the results, level of activity, performance or achievements expressed or implied by the forward-looking statements. Those factors include, but are not limited to, the impact of general economic conditions, competitive products, product demand and market acceptance risks, reliance on key strategic alliances, fluctuations in operating results, and other factors indicated in Mazor's filings with the Securities and Exchange Commission (SEC) including those discussed under the heading "Risk Factors" in Mazor’s annual report on Form 20-F filed with the SEC on April 29, 2015 and in subsequent filings with the SEC. For more details, refer to Mazor's SEC filings. Mazor undertakes no obligation to update forward-looking statements to reflect subsequent occurring events or circumstances, or to changes in our expectations, except as may be required by law.



Contact:

U.S.:
EVC Group
Investors
Michael Polyviou/Doug Sherk
212-850-6020; 415-652-9100
Email Contact; Email Contact
or
Media
David Schemelia, 646-201-5431
Email Contact

Featured Video
Editorial
Jobs
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Mechanical Manufacturing Engineering Manager for Google at Sunnyvale, California
Mechanical Engineer 3 for Lam Research at Fremont, California
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Equipment Engineer, Raxium for Google at Fremont, California
Mechanical Engineer 2 for Lam Research at Fremont, California
Upcoming Events
Celebrate Manufacturing Excellence at Anaheim Convention Center Anaheim CA - Feb 4 - 6, 2025
3DEXPERIENCE World 2025 at George R. Brown Convention Center Houston TX - Feb 23 - 26, 2025
TIMTOS 2025 at Nangang Exhibition Center Hall 1 & 2 (TaiNEX 1 & 2) TWTC Hall Taipei Taiwan - Mar 3 - 8, 2025
Additive Manufacturing Forum 2025 at Estrel Convention Cente Berlin Germany - Mar 17 - 18, 2025



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise