Bentley’s New Cloud Services Offers Instant Insight on the Impact of Structural Design Changes on Project Schedule, Cost and Safety

Bentley’s New Cloud Services Offers Instant Insight on the Impact of Structural Design Changes on Project Schedule, Cost, and Safety

Bentley Systems announces the early access of Bentley’s Design Insights cloud service, a new extension of Bentley’s Scenario Services. Design Insights brings instant insight to the impact of design changes on the performance measures of organizations including project schedule, cost, and safety compliance.

Designers and engineers make hundreds of decisions in relative isolation, without fully understanding the impact of these decisions on other disciplines or downstream activities that influence project performance. Bentley’s Design Insights helps project teams make better-informed and more timely decisions that reduce cost overruns and unexpected project delays as insights into the project are gained much earlier.

Understand at a glance the ramification of change decisions on organizational and project performance metrics.

Design Insights utilizes the common digital engineering iModel created by users of Bentley’s AECOsim Building Designer, OpenPlant Modeler, RAM, STAAD, or Autodesk’s Revit™ to extract insights on key performance metrics for designers, owners, and project managers.

Bentley’s Design Insights enables:

  • Relative estimation of structural safety, cost, and schedule changes between design iterations
  • Heatmaps to identify areas of change between design iterations
  • Practical consideration of multiple design alternatives in parallel

Raoul Karp, Bentley’s VP of product development, analytical modeling, said, “Too often in today’s design world the true impact of important design decisions is not fully understood until construction is well underway. By providing designers, engineers, architects, and owners immediate insight into the downstream ramifications of decisions and tradeoffs to be made during design, team members can make better holistic decisions with the critical information at their fingertips.”

Featured Video
Editorial
Latest Blog Posts
Sanjay GangalMCADCafe Editorial
by Sanjay Gangal
MCADCafe Industry Predictions for 2025 – ProShop
Sanjay GangalMCADCafe Editorial
by Sanjay Gangal
MCADCafe Industry Predictions for 2025 – ModuleWorks
Jobs
Mechanical Engineer 2 for Lam Research at Fremont, California
Mechanical Manufacturing Engineering Manager for Google at Sunnyvale, California
Mechanical Engineer 3 for Lam Research at Fremont, California
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Equipment Engineer, Raxium for Google at Fremont, California
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Upcoming Events
Collaborate North America 2025 at Novi MI - Jan 28, 2025
Celebrate Manufacturing Excellence at Anaheim Convention Center Anaheim CA - Feb 4 - 6, 2025
3DEXPERIENCE World 2025 at George R. Brown Convention Center Houston TX - Feb 23 - 26, 2025
TIMTOS 2025 at Nangang Exhibition Center Hall 1 & 2 (TaiNEX 1 & 2) TWTC Hall Taipei Taiwan - Mar 3 - 8, 2025



© 2025 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise