New Research Shows Design-Build Continues to Deliver Projects Most Efficiently

CII/Pankow Study Says Design-Build is Faster, With More Reliable Performance and Less Cost and Schedule Growth

WASHINGTON, Nov. 14, 2018 — (PRNewswire) —   New research shows that America's design-build projects continue to deliver faster, and with greater reliability in cost and schedule performance, than other delivery methods. It's been 20 years since the seminal CII/Penn State research showed that design-build projects consistently delivered projects more efficiently. Over the decades, even as projects have evolved in complexity through many diverse economic cycles, design-build continues to provide improved value to communities.

Design-Build Delivers Better Schedule

"As our nation continues to struggle with the unmet needs of crumbling infrastructure and budgets stretched thin, it's no surprise that most states have embraced design-build as a better way to deliver projects vital to our economic growth. Whether it's a billion-dollar airport or small community library, this research confirms design-build continues to deliver innovative projects that save time and money. Design-build is clearly a better way to build."…Lisa Washington, CAE, DBIA Executive Director/CEO.

Research Highlights

Project Cost: On average, projects using Design-Build (DB) cost 1.9% less per square foot when compared to Construction Manager at Risk (CMR) and 0.3% less when compared to Design-Bid-Build (DBB). Design-Build projects also average 2.4% less cost growth than a comparably scoped project using CMR and 3.8% less cost growth than a project using DBB.

Project Schedule: Design-Build was the best performing project delivery system in terms of schedule growth, delivery speed and construction speed. DB projects see 3.9% less schedule growth than CMR and 1.7% less than Design-Bid-Build. They're also 13% faster than CMR during the construction phase and 36% faster than DBB. From design through completion, DB projects are delivered 61% faster than CMR and 102% faster than DBB.

The Revisiting Project Delivery Performance research summary is now available online. If you'd like interview researchers, Keith Molenaar, PhD, DBIA, K. Stanton Lewis Professor and Associate Dean, University of Colorado Boulder or Bryan Franz, PhD, Assistant Professor University of Florida, please contact the DBIA Communications department contacts listed below.

The Design-Build Institute, based in Washington, D.C., is the only membership organization bringing together thousands of organizations and individuals representing architects, engineers, Owners, contractors, manufacturers (and more) to define, teach and promote best practices in design-build.

Facebook: https://www.facebook.com/DBIAHQ
Twitter: https://twitter.com/DBIANational
LinkedIn: https://www.linkedin.com/company/dbia/

Media Contact:
Kim Wright, DBIA Strategic Communications Director
Office: (202) 454-7531
Cell: (703) 244-5692
Email Contact

Nathan Smith, DBIA Communications Associate
Office: (202) 454-7519
Email Contact

Design-Build Delivers Better Cost

Cision View original content to download multimedia: http://www.prnewswire.com/news-releases/new-research-shows-design-build-continues-to-deliver-projects-most-efficiently-300750110.html

SOURCE Design-Build Institute of America

Contact:
Company Name: Design-Build Institute of America


Featured Video
Editorial
Jobs
Equipment Engineer, Raxium for Google at Fremont, California
Mechanical Engineer 2 for Lam Research at Fremont, California
Manufacturing Test Engineer for Google at Prague, Czechia, Czech Republic
Mechanical Engineer 3 for Lam Research at Fremont, California
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Upcoming Events
Celebrate Manufacturing Excellence at Anaheim Convention Center Anaheim CA - Feb 4 - 6, 2025
3DEXPERIENCE World 2025 at George R. Brown Convention Center Houston TX - Feb 23 - 26, 2025
TIMTOS 2025 at Nangang Exhibition Center Hall 1 & 2 (TaiNEX 1 & 2) TWTC Hall Taipei Taiwan - Mar 3 - 8, 2025
Additive Manufacturing Forum 2025 at Estrel Convention Cente Berlin Germany - Mar 17 - 18, 2025



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise