G.D Expands Utilization Of PTC(R) Product Development System to Drive Innovation Efficiency, Reduce Costs and Improve Collaboration with Third Parties

NEEDHAM, Mass.—(BUSINESS WIRE)—September 8, 2008— PTC (Nasdaq: PMTC), The Product Development Company®, today announced that G.D has selected PTC® PLM solutions to manage its core product development cycle. G.D, a world leader in the design and manufacturing of automatic packaging machinery, started working with PTC 15 years ago, when Pro/ENGINEER® was introduced. Recently, G.D decided to deploy Windchill®, to replace their existing PLM system Matrixone® in all their Pro/ENGINEER-related applications. The decision to use Windchill was made after a careful evaluation of PTC's enterprise PLM capabilities and the results of a pilot project carried out together with PTC. In particular, Windchill proved to be extremely efficient in managing very complex Pro/ENGINEER data and would help G.D optimize their detailed design activities, expand their digital design capabilities, and continue to improve their overall product development process.

For the past 15 years, the Engineering Department of G.D has been using Pro/ENGINEER high performance capabilities for its top down development process. Windchill was selected for its capability to reliably manage very large Pro/ENGINEER assembly models (tens of thousands components), to remarkably expand their visibility within and outside the organization, through secure shared access, and to ensure full continued compatibility with Pro/ENGINEER complex evolving functionalities.

The core expertise of G.D is its research & development strategy for efficient cigarette making and packing lines. Innovation, design creativity and large investments in the development of new solutions (more then 10% of its annual revenues) have been the companys recipe for revolutionary products. G.D realized that PTCs integral product development system would help them accelerate the Design process and make it more efficient. Key elements of successful design for G.D include turning more ideas into feasible digital products, reuse of designs, implementing concurrent engineering, and collaborating with third-parties. As a result, the entire product development cycle becomes smoother and leaner, i.e. more efficient, with a shorter development time. The innovations introduced by G.D have also been based on its capacity to work as a partner with customers, to understand their needs, to develop new solutions, to plan and reach together future targets. PTC's Product Development System offers G.D the ideal platform to implement this strategy and achieve its business objectives.

Our industry is changing rapidly, and our ability to provide a wider range of innovative, flexible, top-performing packaging solutions, in conjunction with more value-added services, is critical. We need to respond by streamlining our development process, expanding our lean manufacturing practices, and injecting more digital contents to reduce costs and time while increasing our final design quality. PTC is not only able to provide us with the best-in-class product development system to meet these requests, but has also proven to be a first-class service partner for supporting us along this journey, based on a clear deployment roadmap, said Francesco Nicastro, CIO of G.D. The fast roll-out of an integral Product Development System will substantially support our organic growth and allow us to achieve our objectives.

The automated machinery industry is under significant competitive pressure to reduce cycle times and costs by sharing and reusing more mechanical and software data on a global scale, said Josh Fredberg, VP of product and market strategy, PTC. This requires a Web-based PLM infrastructure which can be easily rolled out on a global scale, but it also requires a deep knowledge about the product development process. G.Ds decision to strengthen its partnership with PTC demonstrates that we are providing leading technology combined with the services expertise to help our customers realize important short-term and long-term business achievements.

About G.D

G.D is the world leader in the design and manufacturing of the fastest and most efficient cigarette making and packing lines. Thanks to its wide range of machines, G.D is the only manufacturer capable of supplying complete high-speed lines, from the maker to the packer. G.D is part of COESIA, an industrial group which includes seven companies specialized in the production of automated machinery.

The headquarter is located in Bologna, Italy and thanks to its extensive worldwide sales and service network, consisting of 10 branches, G.D is always near its customers, wherever they are.

About PTC

PTC (Nasdaq: PMTC) provides leading product lifecycle management (PLM), content management and dynamic publishing solutions to more than 50,000 companies worldwide. PTC customers include the world's most innovative companies in manufacturing, publishing, services, government and life sciences industries. PTC is included in the S&P Midcap 400 and Russell 2000 indices. For more information on PTC, please visit http://www.ptc.com

Except for the historical information contained herein, matters discussed in this news release may constitute forward-looking statements that involve risks and uncertainties that could cause actual results to differ materially from those projected. These risks and uncertainties include: the successful development and integration of the technology necessary to offer an integrated and flexible product development system solutions that is able to adequately respond to the evolving requirements of customers in multiple vertical industries; PTC s ability to extend our solutions and provide adequately levels of support, to multiple vertical industries; and PTC s ability to retain and maintain relationships with key employees, customers and other strategic partners; as well as other risks and uncertainties detailed from time to time in reports filed by PTC with the Securities and Exchange Commission, including the Company's most recent reports on Form 10-K and 10-Q. The announcement of any particular selection of PTC products is not necessarily indicative of the timing of recognition of revenue there from or the level of revenue for any particular period.

1 | 2  Next Page »
Featured Video
Editorial
Jobs
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Mechanical Engineer 2 for Lam Research at Fremont, California
Manufacturing Test Engineer for Google at Prague, Czechia, Czech Republic
Mechanical Engineer 3 for Lam Research at Fremont, California
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Equipment Engineer, Raxium for Google at Fremont, California
Upcoming Events
Celebrate Manufacturing Excellence at Anaheim Convention Center Anaheim CA - Feb 4 - 6, 2025
3DEXPERIENCE World 2025 at George R. Brown Convention Center Houston TX - Feb 23 - 26, 2025
TIMTOS 2025 at Nangang Exhibition Center Hall 1 & 2 (TaiNEX 1 & 2) TWTC Hall Taipei Taiwan - Mar 3 - 8, 2025
Additive Manufacturing Forum 2025 at Estrel Convention Cente Berlin Germany - Mar 17 - 18, 2025



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise