Boeing Completes First 787 Dreamliner Engine Runs

EVERETT, Wash., May 21 /PRNewswire-FirstCall/ -- Boeing (NYSE: BA) continued to make steady progress toward the first flight of the 787 Dreamliner, completing the first engine runs on the all-new airplane. The occasion marks the first all-electric start of a commercial jetliner engine on a commercial jetliner; the engines had been started electronically in test facilities earlier.

Engine runs began at 9:30 a.m. (PDT) today and ended 40 minutes later. During initial engine runs, the engines are started and operated at various power settings to ensure all systems perform as expected. Today's engine run test began with the Auxiliary Power System providing power to start the two Rolls-Royce Trent 1000 engines.

Basic systems checks continued throughout the test. The engines were powered down and inspected and will be restarted following a technical review. The team completed a vibration check and monitored the shutdown logic to ensure it functioned as expected.

"We were very pleased with the performance on the engines during this test," said Scott Fancher, vice president and general manager of the 787 program. "We will now get ready for our intermediate and final gauntlet tests."

Contact:

Lori Gunter

787 Communication

+1 206 931 5919

Featured Video
Editorial
Jobs
Mechanical Engineer 3 for Lam Research at Fremont, California
Mechanical Engineer 2 for Lam Research at Fremont, California
Mechanical Manufacturing Engineering Manager for Google at Sunnyvale, California
Equipment Engineer, Raxium for Google at Fremont, California
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Upcoming Events
Consumer Electronics Show 2025 - CES 2025 at Las Vegas NV - Jan 7 - 10, 2025
Collaborate North America 2025 at Novi MI - Jan 28, 2025
Celebrate Manufacturing Excellence at Anaheim Convention Center Anaheim CA - Feb 4 - 6, 2025
3DEXPERIENCE World 2025 at George R. Brown Convention Center Houston TX - Feb 23 - 26, 2025



© 2025 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise