SMIC Reports 2013 Third Quarter Results

 

Capacity*


Fab / (Wafer Size)

3Q13

2Q13

Shanghai Mega Fab (8")

90,000

90,000

Shanghai 12-inch Fab (12")

24,750

18,000

Beijing Mega Fab (12")

81,000

81,000

Tianjin Fab (8")

36,000

34,500

Total monthly wafer fabrication capacity

231,750

223,500


Note:

* Wafers per month at the end of the period in 8" equivalent wafers, calculated on a 30-day basis for comparison purposes

  • Monthly capacity increased to 231,750 8-inch equivalent wafers in 3Q13 from 223,500 8-inch equivalent wafers in 2Q13, primarily due to the expansion of capacity in our Shanghai 12-inch fab.

 

Shipment and Utilization


8" equivalent wafers

3Q13

2Q13

QoQ

3Q12

YoY

Wafer shipments

653,090

687,651

-5.0%

605,543

7.9%

Utilization rate(1)

88.2%

98.5%

-

92.0%

-


Note:

(1) Based on total equivalent wafers out divided by estimated total quarterly capacity.

 

Detailed Financial Analysis

Gross Profit Analysis


Amounts in US$ thousands

3Q13

2Q13

QoQ

3Q12

YoY

Cost of sales

422,274

406,075

4.0%

334,347

26.3%

Depreciation

126,433

107,759

17.3%

93,258

35.6%

Other manufacturing costs

294,374

295,840

-0.5%

240,620

22.3%

Share-based compensation

1,467

2,476

-40.8%

469

212.8%

Gross profit

111,982

135,227

-17.2%

126,821

-11.7%

Gross margin

21.0%

25.0%

-

27.5%

-


  • Cost of sales was $422.3 million in 3Q13, up 4.0% QoQ from $406.1 million in 2Q13.
  • Depreciation within the cost of sales increased to $126.4 million in 3Q13, compared to $107.8 million in 2Q13.
  • Other manufacturing costs within the cost of sales decreased to $294.4 million in 3Q13, compared to $295.8 million in 2Q13.
  • Gross profit was $112.0 million in 3Q13, a decrease of 17.2% QoQ from $135.2 million in 2Q13.
  • Gross margin was 21.0% in 3Q13, down from 25.0% in 2Q13 primarily due to lower fab utilization in 3Q13 and product mix change.

« Previous Page 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10  Next Page »
Featured Video
Editorial
Jobs
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Mechanical Manufacturing Engineering Manager for Google at Sunnyvale, California
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Equipment Engineer, Raxium for Google at Fremont, California
Mechanical Engineer 2 for Lam Research at Fremont, California
Mechanical Engineer 3 for Lam Research at Fremont, California
Upcoming Events
Consumer Electronics Show 2025 - CES 2025 at Las Vegas NV - Jan 7 - 10, 2025
Collaborate North America 2025 at Novi MI - Jan 28, 2025
Celebrate Manufacturing Excellence at Anaheim Convention Center Anaheim CA - Feb 4 - 6, 2025
3DEXPERIENCE World 2025 at George R. Brown Convention Center Houston TX - Feb 23 - 26, 2025



© 2025 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise