UMC Reports Third Quarter 2018 Results

Capacity4 for Foundry Segment

Total capacity in the third quarter reached 1,938K 8-inch equivalent wafers. We anticipate our fourth quarter capacity to grow by approximately 1% QoQ to 1,958K 8-inch equivalent wafers, which included capacity expansion at Fab 8C and Fab 8D.

 

Annual Capacity in
thousands of wafers

     

Quarterly Capacity in
thousands of wafers

FAB   Geometry
(um)
  2017   2016   2015   2014 FAB   4Q18E   3Q18   2Q18   1Q18
WTK   6"   3.5 – 0.45   422   423   421   448 WTK   93   93   106   104
Fab 8A   8"   0.5 – 0.25   825   827   813   813 Fab 8A   207   207   207   204
Fab 8C   8"   0.35 – 0.11   357   348   347   347 Fab 8C   108   92   92   91
Fab 8D   8"   0.13 – 0.09   341   342   341   358 Fab 8D   90   86   86   85
Fab 8E   8"   0.5 – 0.18   418   419   418   418 Fab 8E   105   105   105   103
Fab 8F   8"   0.18 – 0.11   417   401   388   388 Fab 8F   108   108   108   107
Fab 8S   8"   0.18 – 0.11   347   336   335   335 Fab 8S   93   93   93   92
HJ   8"   0.5 – 0.11   753   750   667   547 HJ   194   194   194   190
Fab 12A   12"   0.13 – 0.014   970   885   793   700 Fab 12A   250   250   250   246
Fab 12i   12"   0.13 – 0.040   537   584   572   573 Fab 12i   144   144   136   131
USCXM   12"   0.040 – 0.028   97   9   -   - USCXM   51   51   46   35
Total (1)   7,304   6,983   6,617   6,323 Total   1,958   1,938   1,918   1,858
YoY Growth Rate   5%   6%   5%   4%        
 
 
(1) One 6-inch wafer is converted into 0.5625(6 2 /8 2 ) 8-inch equivalent wafer; one 12-inch wafer is converted into 2.25(12 2 /8 2 ) 8-inch equivalent wafers. Capacity total figures are expressed in 8-inch equivalent wafers.
 
4 Estimated capacity numbers are based on calculated maximum output rather than designed capacity. The actual capacity numbers may differ depending upon equipment delivery schedules, pace of migration to more advanced process technologies, and other factors affecting production ramp-up.
 

« Previous Page 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16  Next Page »
Featured Video
Editorial
Jobs
Business Development Manager for Berntsen International, Inc. at Madison, Wisconsin
Upcoming Events
Consumer Electronics Show 2025 - CES 2025 at Las Vegas NV - Jan 7 - 10, 2025
Collaborate North America 2025 at Novi MI - Jan 28, 2025
Celebrate Manufacturing Excellence at Anaheim Convention Center Anaheim CA - Feb 4 - 6, 2025
3DEXPERIENCE World 2025 at George R. Brown Convention Center Houston TX - Feb 23 - 26, 2025



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise