Chartered Reports Results for Second Quarter 2008

Wafer Shipments and Average Selling Prices (eight-inch equivalent)

  • Shipments in second quarter 2008 were 517.3 thousand wafers, an increase of 49.8 percent compared to 345.2 thousand wafers in second quarter 2007. Shipments in second quarter 2008 increased by 21.8 percent compared to 424.8 thousand wafers shipped in first quarter 2008. Shipments including Chartereds share of SMP were 548.5 thousand wafers, an increase of 43.7 percent compared to 381.6 thousand wafers in second quarter 2007. Shipments including Chartereds share of SMP in second quarter 2008 increased by 20.0 percent compared to 457.2 thousand wafers shipped in first quarter 2008.
  • ASP was $864 per wafer in second quarter 2008, compared to $892 per wafer in first quarter 2008. ASP including Chartereds share of SMP was $860 per wafer in second quarter 2008 compared to $885 per wafer in first quarter 2008.

Capacity and Utilization

Capacity utilization in second quarter 2008 was 88 percent compared to 79 percent in the year-ago quarter, and 86 percent in first quarter 2008. Total capacity in second quarter 2008 was up approximately 17 percent sequentially, primarily due to the acquisition of Fab 3E which was completed at the end of first quarter 2008. Capacity utilization is based on total shipments and total capacity, both of which include Chartereds share of SMP.

Utilization Table

 

Data including Chartereds share of SMP

(Thousand 8 equivalent wafers)

  2Q 2007   3Q 2007   4Q 2007   1Q 2008   2Q 2008
Total wafers shipped   381.6   426.1   415.5   457.2   548.5
Total capacity   483.0   502.2   512.4   534.4   624.8

Utilization

  79%   85%   81%   86%   88%

Capacity by Fab

 
(Thousand 8 equivalent wafers)   2Q 2007   3Q 2007   4Q 2007   1Q 2008   2Q 2008  

Est. 3Q
2008

Fab 2   153.8   155.5   155.5   153.8   153.8   155.5
Fab 3   70.3   70.4   70.4   74.8   80.4   90.3
Fab 3E (a)   -   -   -   -   74.3   75.1
Fab 5 (Chartered s share)   34.9   35.3   35.3   35.5   35.5   35.9
Fab 6   115.8   117.0   120.0   120.2   126.2   127.4
Fab 7   108.2   124.0   131.2   150.1   154.6   177.9
Total   483.0   502.2   512.4   534.4   624.8   662.1

(a) Eight-inch wafer fabrication facility acquired in March 2008.


« Previous Page 1 | 2 | 3 | 4 | 5 | 6 | 7  Next Page »
Featured Video
Editorial
Jobs
Mechanical Manufacturing Engineering Manager for Google at Sunnyvale, California
Manufacturing Test Engineer for Google at Prague, Czechia, Czech Republic
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Equipment Engineer, Raxium for Google at Fremont, California
Senior Principal Software Engineer for Autodesk at San Francisco, California
Upcoming Events
FABTECH Orlando 2024 at Orange County Convention Center Orlando FL - Oct 15 - 17, 2024
TIMTOS 2025 at Nangang Exhibition Center Hall 1 & 2 (TaiNEX 1 & 2) TWTC Hall Taipei Taiwan - Mar 3 - 8, 2025
Automate 2025 at Detroit, Michigan, USA MI - May 12 - 15, 2025



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise