"We are delighted that the second Dreamliner is in the livery of our launch customer, ANA," said Scott Fancher, vice president and general manager of the 787 program. "We are honored by the airline's support and look forward to delivering ANA the first production airplane next year."
Captain Randy Neville was at the controls for the flight, with Chief Pilot Mike Carriker operating as co-pilot. Neville and Carriker took the airplane to an altitude of 13,000 feet (3,962 m) and an airspeed of 200 knots, or about 230 miles (370 km) per hour. The airplane took off at 9:09 a.m. PST and landed at 11:10 a.m. PST.
This is the second of six 787s being used in the airplane's flight-test program. Each of the airplanes will be used for a specific set of tests, with this airplane focusing on systems performance. Like its predecessor, ZA001, the airplane is powered by two Rolls-Royce Trent 1000 engines.
"We would like to convey our sincere congratulations to the Boeing team for its achievement of this milestone, and we look forward to the delivery into our fleet next year," said Shinichiro Ito, president and CEO of ANA.
Photo and caption are available here: http://boeing.mediaroom.com
Contact: | |
Scott Lefeber | |
787 Communications | |
+1 425-266-5824 | |
SOURCE Boeing
Contact: |
Boeing
Scott Lefeber, 787 Communications of Boeing Phone: +1-425-266-5824 Email Contact Web: http://www.boeing.com |